OCIMF_Mooring_Equipment_Guidelines_(Second_Edition)

(Barry) #1

Section


9.

APPENDICES

A.

B.

C.

D.
E.

F.

DECK flTIINGS IN THE MANLFOLD AREA

9.

9.

9.

9.

9.

Introduction

Fitting Arrangement

Filling Details

9.3. 1 Cruciform Bollards


  1. 3.2 Mooring Bollards

  2. 3.3 Pamlln:1-Tyr~' F;lirkaJ~
    9.3.4 Oval Eyeplates
    Lightening Arrangements (Over 160,000 Tonnes OWT)


Mani fold Fillings for Gas Carriers

Design Standard for Tanker Mounted SPM Fittings

Guidelines for Handling, Inspcction and Removal from Service of Wire
Mooring Lines
Care, Handling. Inspection and Rcplacemenr of Fibre Ropes

Example of Force Predictions for Use with Hand Calculation Procedures
Calculation of Mooring Restraint and Loads
Details of Hand Calculation Melhod
Example: Comparison with Computer Method Resuhs

Strength of Chain Tensioncd over a Curved Surface

VIII

Page

141

141
14\

141

141

141

144

144
145

145

147

155

157

159
163

173
Free download pdf