OCIMF_Mooring_Equipment_Guidelines_(Second_Edition)

(Barry) #1

".


""


,


\


/'


/


\ ,


\


.
/
/

Rope
Hatch
~",-"",",,-/ __ ._. __ c=J ~_
To Foc'slo
Space

PRIMARY LINES

--~


  • ---~ AUX. LINES


FIGURE 3.10: 125,000 M3 LNG CARRIER
MOORING ARRANGEMENT ON THE FORWARD DECK

and the lead of springs must be from afr of the accommodation deck house and from the forward
main deck or the forecastle. A typical arrangement is shown in Figs. 3.8, 3.9 and 3 .10.


The lack of maio deck winches on this type of ship can mean that capstans are required close to
tug positions for handling tug I.mes. These should be rated at 1.0 to 1.5 tonnes (10 to 15 kN)
depending upon t.he size and le ngth of the lUg line to be brought onboard. h is also common practice
00 sucb high freeboard ~hip~ to ut.ilize towing chocks reee ed into the side shell at appropriate height.s
for easy handling o f thl.! line from the lUg.