The Knitter - UK (2019-10)

(Antfer) #1
EMMA VINING

Crow Steps


STITCH PATTERNS
RIB PATTERN
(multiple of 4 sts + 2)
Row 1 (RS): P2, K2; rep from to last 2 sts,
P2.
Row 2 (WS): K2, P2; rep from to last 2 sts,
K2.
Repeat Rows 1-2 for pattern.


CHECK PATTERN
(multiple of 4 sts + 2)
Row 1 (RS): K2, P2; rep from to last 2 sts,
K2.
Row 2 (WS): P2, K2; rep from to last 2 sts,
P2.
Row 3: P2, K2; rep from to last 2 sts, P2.
Row 4: K2, P2; rep from to last 2 sts, K2.
Repeat Rows 1-4 for pattern.


CHART A
(worked over 28 sts, set-up rows are not
shown on Chart A)
Set-up row 1 (RS): (K 3, P 3) t w i c e, C 4B ,
(P3, K3) twice.


Set-up rows 2 and 4 (WS): (P3, K3) twice,
P4, (K3, P3) twice.
Set-up row 3: (K3, P3) twice, K4, (P3, K3)
twice.
Rep Set-up rows 1-4 as directed in pattern.
Row 1 (RS): P2, C3F, K4, P3, K4, P3, K4,
C3B, P2.
Row 2 (WS): K2, P7, K10, P7, K2.
Row 3: K2, P2, C3F, K2, P3, C4B, P3, K2,
C3B, P2, K2.
Row 4: P2, K2, P5, K3, P4, K3, P5, K2, P2.
Row 5: P2, K2, P2, C3F, P1, C4B, C4F, P1,
C3B, P2, K2, P2.
Row 6: K2, P2, K2, P3, K1, P8, K1, P3, K2,
P2, K2.
Row 7: K2, P2, K2, C3B, P1, C4F, C4B, P1,
C3F, K2, P2, K2.
Row 8: P2, K2, P5, K3, P4, K3, P5, K2, P2.
Row 9: P2, K2, C3B, K2, P3, C4F, P3, K2,
C3F, K2, P2.
Row 10: K2, P7, K10, P7, K2.
Row 11: K2, C3B, K4, P3, K4, P3, K4, C3F,
K2.
Row 12: P9, K10, P9.
Repeat Rows 1-12 for pattern.

CHART B
(worked over 10 sts, set-up rows are not
shown on Chart B)
Set-up row 1 (RS): P 3, C 4B , P 3.
Set-up rows 2 and 4 (WS): K3, P4, K3.
Set-up row 3: P3, K4, P3.
Rep Set-up rows 1-4 as directed in pattern.
Row 1 (RS): P3, K4, P3.
Row 2 (WS): K10.
Row 3: P3, C4B, P3.
Row 4: K3, P4, K3.

Row 5: P1, C4B, C4F, P1.
Row 6: K1, P8, K1.
Row 7: P1, C4F, C4B, P1.
Row 8: K3, P4, K3.
Row 9: P3, C4F, P3.
Row 10: K10.
Row 11: P3, K4, P3.
Row 12: K10.
Repeat Rows 1-12 for pattern.

BACK
Using 4.5mm needles, cast on
86 ( 94 :102: 114 :122: 132 ) sts.

HEM
Row 1 (RS): Work Row 1 of Rib Patt over
next 10 ( 14 :18: 14 :18: 18 ) s t s, work S e t-up row
1 of Chart B over next 0 ( 0 :0: 10 :10: 10 ) sts,
P0 ( 0 :0: 0 :0: 3 ), work Set-up row 1 of
Ch a r t A ove r n e x t 2 8 s t s, P 0 ( 0 :0: 0 :0: 2 ),
work Set-up row 1 of Chart B over next
10 s t s, P 0 ( 0 :0: 0 :0: 2 ), work S e t-up row 1
of Chart A over next 28 sts, P0 ( 0 :0: 0 :0: 3 ),
work Set-up row 1 of Chart B over next
0 ( 0 :0: 10 :10: 10 ) sts, work Rib Patt to end.
This row sets the patt, with Rib patt,
charts, and rev st st between charts as set.

Cont in patt for 9 rows more, working
Set-up rows 1-2 of charts a total of two
times, then repeating Set-up rows 1-2 once
more.

Change to 5mm needles.

Begin Main Pattern as follows:
Row 1 (RS): Work Row 1 of Check Patt

“MY ‘CROW Steps’ design was inspired
by a distinctive architectural feature
found in the city of Ghent, Belgium,”
says Emma Vining. “Crow steps form
the edges of triangular building gable
fronts, and how I developed this stitch
pattern is the subject of my article on
page 56 of this issue. For this sweater,
I h ave e x te n d e d my or i g i n a l d e si g n i nto
a bold textured cable panel knitted in
Kate Davies’ beautiful Àrd Thìr yarn.”


SIZE


TO FIT
BUST

S M L 1XL 2XL 3XL^
76-81 86-91 97-102 107-112 117-122 127-132 cm
30-32 34-36 38-40 42-44 46-48 50-52 in
ACTUAL
BUST

90 99 108½ 119 128½ 138½ cm
35¼ 39 42¾ 47 50½ 54½ in

LENGTH TO
SHOULDER

54½ 55 57 58 59 60 cm
21½ 21¾ 22½ 22¾ 23¼ 23½ in

WINGSPAN

52½ 57 62 67½ 72½ 78 cm
20¾ 22½ 24½ 26½ 28½ 30¾ in

YARN
Kate Davies Designs Àrd Thìr (Aran weight; 60% Peruvian highland wool, 40% alpaca;
65m/71yds per 50g skein)
VEYATIE
(5009)^101113151618

x50g
SKEINS

The Knitter 10 Issue 143 Subscribe now at TheYarnLoop.com

Free download pdf