The Shed – September-October 2019

(singke) #1
1RWDGL̇FXOWMREEXW
WKHQHZ+DUGLH*OD]H
SDQHOVDUHH[SHQVLYH
DQGQHHGFDUHLQ
KDQGOLQJPHDVXULQJ
DQGFXWWLQJ

Left: The enclosure stripped out and 10mm
laths added to all the joists and dwangs
Above: First HardieGlaze panel fitted and
glued in place

Below: Moving the hinge line 10mm involved cutting 10mm off
the right-hand end and gluing and pop riveting it to the left-
hand end. The two support fittings keep the channel level and
3mm clear of the supporting shelf on which the door sits


Below: Final check for plumb. The bottom screw thread
and the alignment rod in place
Free download pdf