Truckin’ – November 2019

(やまだぃちぅ) #1

Truckin Tech Project Rebirth ’71 Suburban, Part 4



  • TRUCKIN.COM [7 4 ] NOVEMBER 2019 -






















13. With his custom bracket ready, Seth utilized a
factory bolt in the firewall to mount it. These details
will never be seen, but it’s a clean way to keep
everything in place, and those extra details are what
keep clients coming back to Lowboy Motorsports.
14. Seth moved on to clipping the wires from the
factory harness that are needed for the new gauges.
These include power, ground, and accessory.



  1. The Dakota Digital control box was mounted to our
    custom bracket and ready to be wired up.




  2. After separating the necessary wires from the
    harness, Seth began to make the new connections to
    the control box with a small slotted screwdriver.




  3. Our power, ground, and accessory wires are stripped then
    tightened into the marked locations on the unit.




  4. The speedometer sender cable routed from the transmission
    into the cab was then hooked up.



Free download pdf