Douglas_Max,_Robert_Bacal]_Perfect_Phrases_for_Se

(singke) #1
143

Plant Maintenance


■Respond to emergency physical plant situations within
20 minutes of notification.
■Shut down the heating system in emergency situations
according to manufacturer’s shutdown instructions.
■Eliminate your own maintenance errors that affect
plant productivity.
■Eliminate injuries to employees resulting from your
own errors in maintaining assigned equipment.
■Inform supervisor of the progress of every repair so he
or she can communicate effectively with plant supervi-
sors as needed.
■Carry out preventative maintenance for assigned
machines and as set out in manufacturers’ guidelines.
■Identify probable causes of potential failure of major
equipment and notify manager for preventive repair
and replacement.
■Maintain maintenance and repair logs for all major
physical plant machinery.
■Develop and maintain positive relationships with out-
side repair and maintenance personnel.


Safety


■Notify management and HAZMAT team of any poten-
tial hazardous substance spills within 10 minutes of
identifying them.
■Spot and remove any items out of place that may con-
stitute safety hazards.
■Place warning signs when cleaning floors so there are
zero customer accidents related to improper signage.
■Eliminate all occurrences of spillage of hazardous mate-
rial as a result of your own handling errors.

Free download pdf