Spin-Off – September 2019

(singke) #1

90 Spin Off • http://www.interweave.com


PROJECT

angled) selvedge edge of section 1. (Last picked-up st is
between first 2 live sts of section 1, under the needle.)
Knit 2 rows. Break MC. Slide sts to other end of needle.
With CC1, 2nd (smaller) cir needle, and RS facing, with
live sts on left needle, leaving a 3-yd tail, CO 14 sts
onto left needle—153 (177) sts.
Row 1 (RS) K13, ssk, turn—1 st dec’d.
Row 2 Knit.
Rep last 2 rows 36 (39) more times—116 (137) sts
rem. Break CC1. Join CC2. Rep last 2 rows 25 (40)
times—91 (97) sts rem. Break CC2. Join CC3. Rep last
2 rows 51 (40) times—40 (57) sts rem.
Break CC3. Join CC4. Rep last 2 rows 25
(40) times—15 (17) sts rem. Break CC4.

Handspun version only
Join CC5. Rep last 2 rows 2 times—15 sts rem. Do
not break yarn.

Both versions
Section 3
Set-up row (RS) With CC5, k13, sl 1 pwise wyb,
k2tog (last st on 2nd [smaller] cir needle and first st
on first [larger] cir needle), psso, with 2nd (smaller) cir
needle and RS facing, knit to end—108 (124) sts.
Next row Knit.
Rows 1 and 3 (RS) Knit to last 2 sts, M1L, k2—
1 st inc’d.
Row 2 Knit.
Rows 4–6 Knit.

Original version only
Rep Rows 1–6 again, then rep Rows 1–4 once
more—114 sts. Break CC5. Join CC6. Work Rows 5 and
6, then work Rows 1–6 once more—116 sts. Break CC6.
Free download pdf