Barrons AP Calculus - David Bock

(dmanu) #1

  1. (A) Let T be the number of weeks required to release 9 tons. We can use parts to integrate
    then substitute the limits. We must then set the resulting expression equal to 9 and solve
    for T. A faster, less painful alternative is to use a graphing calculator to solve the equation


The answer is about 10.2 weeks.
Free download pdf