B2B Purchase – July 2019

(Michael S) #1

scaffolding & formwork profile


A


fter proving its products and services in
the market globally, Peri has developed
pioneering formwork and scaffolding
technologies which continue to set standards in the
industry.

PERI UP MI is an innovative solution among the
steel shoring and scaffolding systems and stands
for quick and simple assembly. It has unique gravity
lock technology with the system’s ledger having a
connection in the form of a wedge, which is hooked
into the rosette opening. Thus, the gravity lock drops
into the rosette opening due to its own weight and
locks self-actuating. This feature enables simple and
safe assembly of the system and saves time and cost,
notably.

Peri Duo: A success story in universal application
formwork system
Peri Duo, a universal application formwork system (single
system for walls, foundations, columns and slabs) was launched
in India. The product has been a big hit since then as it is seen
as a potential replacement for the conventional formwork.
PERI DUO was also awarded as the “Best Innovation Machine
Award” at the Bauma Conexpo India 2016. It is ergonomic in
all aspects. Time, labour, cost saving along with high flexibility
is the major advantage for end users. The system ensures high
productivity and reduces requirement of skilled labour on site.
Being a light-weight formwork system, it is crane independent
and has intuitive application.

DUO formwork is manufactured from robust techno polymer
and offers virtually tool-free assembly. Techno polymers
are shrink-free, develop no moisture expansion and do not
rust. These features make the system beneficial compared
to conventional formwork which enhances the life of the
product and ensures maximum repetitions. n

For more details, contact
Raj Lakhani
Managing Director,
PERI (India) Private Limited

Why Ihita aluminium formwork
Ihita formwork has high repetitions of about 200 cycles,
with low cost. With Ihita aluminium formwork construction
is simple, effective and requires no skilled labours. High-
quality finishing is obtained, hence no plastering required,
saves up construction time and plastering cost. Saves
overhead expenses due to speedy construction guaranteed
(7 days cycle). It is not just the price which matters
today but a combination of quality, timely-delivery,
consistently performing products, and most importantly,
a complementing product for an overall project. With
ingenious design team, experienced and enthusiastic site
engineers and site supervisors, Ihita Aluminium Formworks is
now on the path of growth, emerging globally in the building
materials market. The achievements of an organisation are
the results of the combined efforts of every individual. Ihita
wishes its team and clients a Happy 10th Year. n

For more details, contact
Aravindan,
Senior Sales Manager,
Ihita Engineering Services Pvt Ltd
Mob: 9566057225
http://www.ihitaformworks.com

52 B2BPurchase July 2019


Staircase Formwork

Ihita Aluminium Formwork System

Simple and secure scaffolding


equipment

Free download pdf