Estimating in Building Construction
- chapter
- INTRODUCTION TO ESTIMATING
- 1–1 General Introduction
- 1–2 Types of Estimates
- Detailed Estimate
- Assembly Estimating
- Square-Foot Estimates
- Parametric Estimates
- Model Estimating
- Project Comparison Estimates
- 1–3 Estimating Opportunities
- 1–4 The Estimator
- 1–5 Quantity Surveying
- 1–6 Types of Bids
- 1–7 Contract Documents
- 1–8 Bidding Information
- 1–9 Availability of Contract Documents
- Information 1–10 Sources of Estimating
- Web Resources
- Review Questions
- CONTRACTS, BONDS, AND INSURANCE
- 2–1 The Contract System
- 2–2 Types of Agreements
- Fixed Price) Lump-Sum Agreement (Stipulated Sum,
- Unit-Price Agreement
- Cost-Plus-Fee Agreements
- 2–3 Agreement Provisions
- 2–4 Bonds
- Bid Bond
- Performance Bond
- Labor and Material Bond
- 2–5 Obtaining Bonds
- 2–6 Insurance
- Web Resources
- Review Questions
- PROJECT MANUAL
- 3–1 Introduction
- Institute 3–2 Construction Specifications
- for Bids) 3–3 Invitation to Bid (Advertisement
- for Bidders) 3–4 Instruction to Bidders (Information
- 3–5 Bid (Proposal) Forms
- Agreement 3–6 Form of Owner/Contractor
- 3–7 General Conditions
- Conditions 3–8 Supplementary General
- 3–9 Specifications
- 3–10 Alternates
- 3–11 Addenda
- 3–12 Errors in the Specifications
- Web Resources
- Review Questions
- THE ESTIMATE
- 4–1 Organization
- 4–2 Planning the Estimate
- 4–3 Notebook
- 4–4 To Bid or Not to Bid
- 4–5 The Estimate
- 4–6 Site Investigation
- 4–7 Specialty Contractors
- 4–8 Materials
- 4–9 Workup Sheets
- 4–10 Summary Sheet
- 4–11 Errors and Omissions
- Web Resources
- Review Questions
- COMPUTERS IN ESTIMATING
- 5–1 Overview
- Estimating 5–2 Benefits and Dangers of Computerized
- 5–3 Spreadsheets
- Software 5–4 Specialized Estimating
- 5–5 Takeoff Software
- Web Resources
- Review Questions
- OVERHEAD AND CONTINGENCIES
- 6–1 Overhead
- 6–2 Home Office Overhead
- Direct Overhead) 6–3 Job Overhead (General Conditions,
- 6–4 Scheduling
- 6–5 Contingencies
- 6–6 Checklist
- Undistributed Labor
- Facilities Temporary Buildings, Enclosures, and
- Temporary Office
- Barricades and Signal Lights
- Temporary Utilities
- Repairs and Protection
- Relocating Utilities
- Cleaning
- Permits
- Professional Services
- Labor Burdens and Taxes
- Bonds and Insurance
- Services Miscellaneous Equipment and
- Web Resources
- Review Questions
- LABOR
- Productivity 7–1 Labor Hours and
- 7–2 Unions—Wages and Rules
- 7–3 Open Shop
- 7–4 Labor Burden
- 7–5 Pricing Labor
- Web Resources
- Review Questions
- EQUIPMENT
- 8–1 General
- 8–2 Operating Costs
- 8–3 Depreciation
- 8–4 Interest
- 8–5 Ownership Costs
- 8–6 Rental Costs
- 8–7 Miscellaneous Tools
- 8–8 Cost Accounting
- 8–9 Mobilization
- 8–10 Checklist
- Review Questions
- EXCAVATION
- 9–1 General
- 9–2 Specifications
- 9–3 Soil
- 9–4 Calculating Excavation
- 9–5 Equipment
- Rough Grading 9–6 Earthwork—New Site Grades and
- Cross-Section Method
- Average End Area
- 9–7 Perimeter and Area
- 9–8 Topsoil Removal
- 9–9 General Excavation
- 9–10 Special Excavation
- 9–11 Backfilling
- 9–12 Excess and Borrow
- Grade 9–13 Spreading Topsoil, Finish
- 9–14 Landscaping
- 9–15 Pumping (Dewatering)
- 9–16 Rock Excavation
- 9–17 Subcontractors
- 9–18 Excavation Checklist
- 9–19 Piles
- 9–20 Pile Checklist
- 9–21 Asphalt Paving
- Web Resources
- Review Questions
- CONCRETE
- 10–1 Concrete Work
- 10–2 Estimating Concrete
- 10–3 Reinforcing
- 10–4 Vapor Retarder
- 10–5 Accessories
- 10–6 Concrete Finishing
- 10–7 Curing
- 10–8 Transporting Concrete
- 10–9 Forms
- 10–10 Form Liners
- 10–11 Checklist
- 10–12 Precast Concrete
- 10–13 Specifications
- 10–14 Estimating
- 10–15 Precast Tees
- 10–16 Precast Slabs
- Columns 10–17 Precast Beams and
- 10–18 Miscellaneous Precast
- 10–19 Precast Costs
- 10–20 Precast Checklist
- Web Resources
- Review Questions
- MASONRY
- 11–1 General
- 11–2 Specifications
- 11–3 Labor
- 11–4 Bonds (Patterns)
- 11–5 Concrete Masonry
- Concrete Block
- Masonry 11–6 Specifications—Concrete
- 11–7 Estimating—Concrete Masonry
- 11–8 Clay Masonry
- 11–9 Specifications—Brick
- 11–10 Estimating Brick
- 11–11 Specifications—Tile
- 11–12 Estimating Tile
- 11–13 Stone Masonry
- 11–14 Specifications—Stone
- 11–15 Estimating Stone
- 11–16 Mortar
- 11–17 Accessories
- 11–18 Reinforcing Bars
- 11–19 Cleaning
- 11–20 Equipment
- 11–21 Cold Weather
- 11–22 Subcontractors
- 11–23 Checklist
- Web Resources
- Review Questions
- METALS
- 12–1 General
- 12–2 Structural Metal
- 12–3 Structural Metal Framing
- 12–4 Metal Joists
- 12–5 Metal Decking
- Metal 12–6 Miscellaneous Structural
- 12–7 Metal Erection Subcontractors
- 12–8 Miscellaneous Metals
- 12–9 Metal Checklist
- Web Resources
- Review Questions
- WOOD
- 13–1 Frame Construction
- 13–2 Board Measure
- 13–3 Floor Framing
- 13–4 Wall Framing
- Exterior Walls
- Interior Walls
- 13–5 Ceiling Assembly
- 13–6 Roof Assembly
- 13–7 Trim
- 13–8 Labor
- 13–9 Wood Systems
- 13–10 Wood Trusses
- Arches 13–11 Laminated Beams and
- 13–12 Wood Decking
- 13–13 Plywood Systems
- 13–14 Wood Checklist
- Web Resources
- Review Questions
- THERMAL AND MOISTURE PROTECTION
- 14–1 Waterproofing
- 14–2 Membrane Waterproofing
- 14–3 Integral Method
- 14–4 Metallic Method
- 14–5 Dampproofing
- 14–6 Painting Method
- 14–7 Parging (Plastering)
- 14–8 Insulation
- 14–9 Roofing
- 14–10 Roof Areas
- 14–11 Shingles
- Asphalt Shingles
- Wood Shingles
- 14–12 Built-Up Roofing
- Ribbed, V-Beam) 14–13 Corrugated Sheets (Including
- 14–14 Metal Roofing
- 14–15 Slate
- 14–16 Tile
- Formula 14–17 Sheets, Tile, and Shingles
- 14–18 Liquid Roofing
- 14–19 Flashing
- 14–20 Insulation
- 14–21 Roofing Trim
- 14–22 Labor
- 14–23 Equipment
- 14–24 Checklist
- Web Resources
- Review Questions
- DOORS AND WINDOWS
- Frames 15–1 Window and Curtain Wall
- 15–2 Accessories
- 15–3 Doors
- (Premachining) Doors 15–4 Prefitting and Machining
- 15–5 Prefinishing Doors
- 15–6 Door Frames
- 15–7 Hardware
- 15–8 Accessories
- Frames 15–9 Checklist for Doors and
- 15–10 Glass
- Review Questions
- FINISHES
- Construction 16–1 Drywall and Wetwall
- Construction 16–2 Supporting
- Systems 16–3 Suspended Ceiling
- 16–4 Types of Assemblies
- 16–5 Wallboard Types
- 16–6 Drywall Partitions
- 16–7 Column Fireproofing
- 16–8 Accessories
- 16–9 Wetwall Construction
- 16–10 Plaster
- 16–11 Lath
- 16–12 Accessories
- Checklist 16–13 Drywall and Wetwall
- 16–14 Flooring
- Wood Flooring
- Laminate Flooring
- Resilient Flooring
- Carpeting
- Tile
- 16–15 Painting
- Checklist 16–16 Floors and Painting
- Web Resources
- Review Questions
- chapter
- ELECTRICAL
- 17–1 Electrical Work
- 17–2 Single Contracts
- 17–3 Separate Contracts
- 17–4 Coordination Requirements
- 17–5 Checklist
- Review Questions
- PLUMBING
- 18–1 Plumbing Work
- 18–2 Single Contracts
- 18–3 Separate Contracts
- 18–4 Coordination Requirements
- 18–5 Checklist
- Review Questions
- CONDITIONING HEATING, VENTILATING, AND AIR-
- Air-Conditioning) 19–1 HVAC Work (Heating, Ventilating, and
- 19–2 Single Contracts
- 19–3 Separate Contracts
- 19–4 Coordination Requirements
- 19–5 Checklist
- Review Questions
- PROFIT
- 20–1 Profit
- Review Questions
- OTHER ESTIMATING METHODS
- 21–1 Overview
- 21–2 Project Comparison Method
- 21–3 Square-Foot Estimating
- 21–4 Assembly Estimating
- Web Resources
- Review Questions