Overhead and Contingencies 49
FIGURE 6.5.Sample Schedule.
Ladders and stairs—used prior to permanent ones being
installed
Temporary partitions—used to separate new construc-
tion from existing facilities
Temporary closures for doors and windows
First aid
Construction elevators, hoists, and cranes
Noise control
Dust control
Water control
Te l e p h o n e
Heat
Lights and power
Computers
Stationery
Project sign and associated signage
To Estimate Cost
Labor Typically none, except for office set-up
Materials/Equipment
Barricades and Signal Lights
Building and maintaining barricades
Cost of maintaining signal lights
To Estimate Cost
Labor
Material
Quantity of materialsUnit price
Quantity of materialsProductivity rate
Pest/rodent control Duration required at job siteMonthly cost
To Estimate Cost
Labor
Material
Temporary Office
Temporary job office
Temporary office for architect/inspector
Quantity requiredUnit cost
Quantity requiredProductivity rate