Estimating in Building Construction

(Kalthiya AryanmXZGQq) #1
Project: Estimate No. 1234
Location Sheet No. 1 of 1
Architect U. R. Architects CUT & FILL Date 1/1/20XX
Items Rough Grading By LHF Checked JBC
Grid
12345 Points Average Area Total 12345 Points Average Area Total
1000000
20000.3 4 0.075 2500 188 0 0 0
3 0 0 0.3 3 0.1 375 38 0 0 0.7 3 0.233333 875 204
4 0 0 0.7 3 0.233333 625 146 0 0 0.7 3 0.233333 625 146
5 0.7 1.3 0 0 4 0.5 2500 1,250 0 0 0
6 1.3 1.5 0 0 4 0.7 2500 1,750 0 0 0
7 1.5 0 0 0 4 0.375 2500 938 0 0 0
8 0 0.5 0 0 4 0.125 2500 313 0 0 0
9 0.5 0.4 0 0.3 4 0.3 2500 750 0 0 0
10 0.3 0 0.4 0 4 0.175 1100 193 0 0.7 0 0.3 4 0.25 1400 350
11 0 0 0.7 3 0.233333 287.5 67 0.7 0 0 0.8 0.3 5 0.3 2212.5 664
12 0 0.7 1.3 0.4 0 5 0.48 2054.5 986 0 0 0.8 3 0.266667 445.5 119
13 1.3 1.5 0.4 1.8 4 1.25 2500 3,125 0 0 0
14 1.5 0 1.8 0 4 0.825 2500 2,063 0 0 0
15 0 0.7 0 0.5 4 0.3 2500 750 0 0 0
16 0.5 0.4 0.7 0.3 4 0.475 2500 1,188 0 0 0
17 0.4 0 0 0.1 0.3 5 0.1 2101 210 0 0.3 0 3 0.1 399 40
18 0 0 0.1 3 0.033333 36 1 0 0 0.8 0.8 0.3 5 0.32 2464 788
19 0 0.4 0 3 0.133333 425 57 0.8 0 0 0.8 4 0.4 2075 830
20 0 1.6 0.4 1.8 4 0.95 2500 2,375 0 0 0
21 1.6 0 1.8 0 4 0.85 2500 2,125 0 0 0
22 0 0.9 0 0.7 4 0.4 2500 1,000 0 0 0
23 0.7 0.3 0.9 1 4 0.725 2500 1,813 0 0 0
24 1 0.3 0.7 0 4 0.5 2500 1,250 0 0 0
25 0.1 0 0 0.3 4 0.1 625 63 0 0.8 0 0.5 4 0.325 1875 609
26 0 0 0 0.8 0.5 0.5 0 4 0.45 2500 1,125
27 0 1.6 0.9 0 4 0.625 2050 1,281 0 0.5 0 3 0.166667 450 75
28 0.9 0 1.6 0 4 0.625 2500 1,563 0 0 0
29 0 0.9 0 1 4 0.475 2500 1,188 0 0 0
30 0.9 1 1 1.1 4 1 2500 2,500 0 0 0
31 1.1 0.6 1 0.3 4 0.75 2500 1,875 0 0 0
32 0.3 0 0.6 0 4 0.225 1550 349 0 0.5 0.1 0 4 0.15 950 143
33 0 0 0 0.5 0.5 0.1 0.8 4 0.475 2500 1,188
34 0 0.9 0 0.5 4 0.35 1275 446 0.5 0 0.8 0 4 0.325 1225 398
35 0.9 0 0.5 0 4 0.35 2500 875 0 0 0
360001 4 0.25 2500 625 0 0 0
37 1 1.1 0 0 4 0.525 2500 1,313 0 0 0
38 1.1 0.6 0 0 4 0.425 2500 1,063 0 0 0
39 0.6 0 0 3 0.2 1075 215 0.1 0 0 3 0.033333 175 6
40 0 0 0 0.1 0.8 0 0 4 0.225 2500 563
41 0.5 0 0 3 0.166667 475 79 0.8 0 0 3 0.266667 775 207
42 0.5 0 0 0 4 0.125 2500 313 0 0 0
0000
36,317 7,453
1,345 276
0.95 0.25
1,416 345
1,140

Little Office Building
Littleville, TX

ESTIMATE WORK SHEET

Net Bank Cubic Yards to Purchase

Fill Cut
Fill At Intersections Cut At Intersections

Swell Factor
Loose Cubic Yards of Cut to Haul
Shrinkage Factor
Required Bank Cubic Yards of Fill

TOTAL CUT - Bank Cubic Feet
Bank Cubic Yards
TOTAL FILL - Compacted Cubic Feet
Compacted Cubic Yards

FIGURE 9.16.Completed Cut and Fill Worksheet. 

FIGURE 9.17.Parking Lot Site Plan.

In the previous examples, it was assumed that the finish
grade was the point at which the earthwork took place; how-
ever, this is typically not true. In Figure 9.17, the planned
contour lines on the parking lot represent the top of the


asphalt. Therefore, the rough grading will be at an elevation
different from the one shown on the site plan. In this sce-
nario, the elevation for the rough grading needs to be
reduced by the thickness of the asphalt and base material.