Subscribe at http://www.gathered.how/simplyknitting 23
KID’S SHEEP JUMPER
Dec1 statneckedgeonnextrowandthefoll4 ( 4 : 5 : 5 : 5 ) rows,
thenonnextRSrowandfoll5 ( 5 : 5 : 6 : 6 ) alt rows.
[17( 17 : 19 : 18 : 21 ) sts]
Continststuntilworkmeas 32 ( 36 : 42 : 46 : 50 )cm from cast-on
edge,ending after a WS row.
Castoff.
SHAPERIGHTNECK
WithRSfacing,slip 10 ( 12 : 12 : 14 : 14 ) stsontoa stitchholder for
neckband,rejoinYarnBto rem sts and knit to end.
[28( 28 : 31 : 31 : 34 ) sts]
CompleteasforLeftNeckfrom*** to end.
SLEEVES(MAKE2)
Caston 40 ( 44 : 48 : 52 : 56 ) stsusing3.25mm needles and Yarn A.
Row 1 (RS)*K1,P1;repfrom* toend.
Row 2 (WS)*P1,K1;repfrom* to end.
These 2 rows form moss st.
Workinmoss st for a further7 ( 9 : 11 : 13 : 13 ) rows, ending after a RS
row.
Next row (WS) Purl.
Change to 4mm needles and Yarn B.
LEFTSLEEVEONLY
Nowcontinststandstripepattof6 rows of Yarn B, 2 rows of Yarn
A throughout as instructed below.