Crochet Now - UK (2020-04)

(Antfer) #1
http://www.crochetnow.co.uk | 47

Accessory


Sport 4.5mm Tunisian


★★ ★ Adventurous


Yarn used
Scheepjes River Washed
9 skeins in Mersey 961
Visit http://www.scheepjes.com to find your
local stockist

About the yarn
Sport; 130m per 50g skein; 78% cotton,
22% acrylic

Tension
17 sts x 14 rows = 10cm measured
over st patt

Hook used
4.5mm Tunisian hook, at least
100cm long

Sizing
139cm x 114cm x 177cm (wingspan)

Start crocheting


Shawl is crocheted with RS facing
throughout. Increases are made in the first
stitch on every row by working Tunisian
simple stitch in the first vertical bar (which
is normally missed).
Take care not to miss the first stitch after
the increase stitch, as this tends to hide
under the increase stitch.


Chain 2.
Row 1 FP: Insert hook in back bump of
2nd ch from hook, yrh, pul. 2 loops on hook
Row 1 RP & all RP except as noted:
Standard RP.
Row 2: 1 Tss in first vertical bar, 1 Tes.
3 loops on hook
Row 3: 1 Tss in first vertical bar, 1 Tps,
1 Tes. 4 looks on hook
Row 4: 1 Tss in first vertical bar, 1 Tps,
1 Tss, 1 Tes. 5 loops on hook
Row 5: 1 Tss in first vertical bar, 1 Tps,
1 Tss, 1 Tps, 1 Tes. 6 loops on hook
Row 6: 1 Tss in first vertical bar, [1 Tps,
1 Tss] twice, 1 Tes. 7 loops on hook
Row 7 FP: 1 Tss in first vertical bar,
[1 Tps, 1 Tss] twice, 1 Tps, 1 Tes. 8 loops
on hook


Row 7 RP: Tcl across.
Row 8: Fpcl across. 9 loops on hook
Row 9: 1 Tss in first vertical bar, Tss
across to last st, 1 Tes. 10 loops
on hook
Row 10: As Row 9. 11 loops on hook
Row 11: 1 Tss in first vertical bar, Tms
across to last 2 sts, yrh, miss next
vertical bar, 1 Tes. 12 loops on hook
Row 12: 1 Tss in first vertical bar, 1 Tss,
Fptm to end. 13 loops on hook
Row 13 FP: As Row 9. 14 loops on hook
Row 13 RP: Tcl across.
Rows 14-181: Rep rows 8-13 twenty-
eight times. 182 loops on hook
Rows 182-185: Rep rows 8-11 once.
186 loops on hook
Row 186: 1 Tss in first vertical bar,
*1 Tss, 1 Tps in next yrh loop; rep
from * to last st, 1 Tes. 187 loops
on hook
Row 187: 1 Tss in first vertical bar,
*1 Tss, 1 Tps; rep from * to last 2 sts,
1 Tss, 1 Tes. 188 loops on hook
Row 188: 1 Tss in first vertical bar,
*1 Tss, 1 Tps; rep from * to last st,
1 Tes. 189 loops on hook
Rows 189-192: Rep rows 187-188
twice. 193 loops on hook
Row 193: Fasten off.

Weave in ends and block to
dimensions given.

Special abbreviations
FP: Forward pass
RP: Return pass
Tss: Tunisian simple stitch
Tps: Tunisian purl stitch
Tunisian Edge Stitch (Tes): Insert
hook into the last st from front to back
so that you have 2 strands of yarn to
the left of hook and one to the right,
yrh and pul
Tunisian cluster (Tcl): This stitch is
worked on RP; *2 ch, yrh, draw through
4 loops on hook; rep from * to last 2
loops on hook, 1 ch, yrh, draw through
2 loops on hook
Forward pass after Tcl (Fpcl):
1 Tss in first vertical bar, insert hook in
front loop of 1 ch, yrh, pul, insert hook
in back loop of same 1ch, yrh, pul,
*[insert hook in front loop of next ch
of 2 ch, yrh, pul] twice, insert hook in
back loop of ch just worked into, yrh,
pul; rep from * to last 2ch, insert hook
in front loop of next ch of 2ch, yrh, pul,
1 Tes
Tunisian mesh stitch (Tms): Yrh,
miss next vertical bar, 1 Tss in next
vertical bar
Forward pass after Tms (Fptm):
Insert hook from right to left in next yrh
loop, yrh, pul, *1 Tss, insert hook from
right to left in next yrh loop, yrh, pul;
rep from * to last st, 1 Tes
Fasten off: *Insert hook from right to
left under next front vertical bar, pul,
draw through 1 loop on hook (as a sl st;
1 loop on hook); rep from * to end

Chart


Key

Free download pdf