The Knitter - UK (2020-03)

(Antfer) #1
YARN SUPPLIERS
Baa Ram Ewe
01937 547135
http://www.baaramewe.co.uk
Bergère de France
http://www.bergeredefrance.co.uk
DROPS Design
c/o Wool Warehouse
0 1926 882 818
http://www.woolwarehouse.co.uk
Ella Rae
c/o Knitting Fever
http://www.knittingfever.com
King Cole
01756 703670
http://www.kingcole.com
Rowan
01484 668200
http://www.knitrowan.com

West Yorkshire Spinners
01535 664500
http://www.wyspinners.com

BOOK PUBLISHERS
Dover Publications
http://www.doverpublications.com
Available in the UK from
http://www.amazon.co.uk
Page Street Publishing
http://www.pagestreetpublishing.com
Available in the UK from
http://www.melia.co.uk
Pantsville Press
http://www.pantsvillepress.com
c/o Search Press (see below)
Search Press
01892 510 850
http://www.searchpress.com

alt alternate
approx approximately
beg beginning
ch chain
cn cable needle
cont continue
dc double crochet
(US single crochet)
dec decrease (work two
stitches together)
DK double knitting
DPN double-pointed needle
dtr double treble
(US treble crochet)
est established
foll following
inc increase
K knit
KFB knit into front and
back of stitch
K2tog knit the next two
stitches together
kwise knitwise
meas measures
M1 make one (see M1L)
M1pw make 1 st purlwise:
with LH needle lift the
strand between next
and last st from front
to back and purl
through the back loop
M1L left leaning increase:
with left needle tip, lift
strand between
needles from front to
back. Knit lifted loop
through back of loop
M1R right leaning increase:
with left needle tip,
lift strand between
needles from back to
front. Knit lifted loop
through front of loop


MB make a bobble
mrk marker
P purl
patt pattern(s)
PB place bead
PFB purl into front and
back of stitch
pm place marker
prev previous
psso pass slipped stitch
over
P2tog purl 2 stitches
together
P3tog purl 3 stitches
together
pwise purlwise
rem remain(ing)
rep(s) repeat(s)
rev st st reverse stocking stitch
RH right hand
RS right side
skpo slip 1, knit 1, pass
slipped stitch over
sk2po slip 1, knit 2 tog, pass
slipped stitch over
s2kpo slip 2 tog kwise, knit 1,
pass slipped sts over
Sl slip^
sl st slip stitch
ss slip stitch (crochet)
slm slip marker
SSK slip 2 stitches one at
a time, return to LH
needle, knit 2 slipped
stitches together tbl
SSP slip 2 stitches one at
a time, return to LH
needle, purl 2 slipped
stitches together tbl
st(s) stitch(es)
st st stocking stitch
tbl through back of loop
tog together
tr treble crochet
(US double crochet)
w&t wrap and turn
WS wrong side
wyib with yarn in back
wyif with yarn in front
yb take yarn back (no inc)
yf bring yarn to front
(no inc)
yfwd yarn forward
yo yarn over
yrn yarn round needle

INFORMATION


An archive of our Masterclasses is available online:
http://www.gathered.how/knitting-and-crochet/knitting/
how-to-knit/

Abbreviations Contacts


Our archive of updates can be found at:
http://www.gathered.how/theknitter

Pattern updates


ISSUE 141
Uradale Frost
Instructions are missing for
the Back right neck – please
work as per the instructions
given for the left neck,
reversing all shapings.

ISSUE 144
Tu l ip Sl ipp e r s
At the start of Slipper 1, after
casting on with yarn B and
joining into the round, you
should then join in a second
s t r a n d o f ya r n B , n o t ya r n A
as written.

ISSUE 147
Eirlys
One of the colours is listed
incorrectly. Yarn G should
actually be Brasov 038.

Shaded Diamonds
In the chart for this design,
yarn O is missing from the top
of the second diamond, with
yarn N shown again instead.
You can download the
corrected section of the chart
here:
http://bit.ly/TKerrata2020

There is a correction
for the slipper pattern
in Issue 144

The Knitter 89 Issue 149

Free download pdf