SUMMER TEA COSY
10 Subscribe at http://www.theyarnloop.com/simply-knitting
GERANIUM(MAKE4)
Caston 10 stsusing3.25mmneedlesandYarnD.
Row 1 (Kfb,K1)totheendoftherow.[15sts]
Row 2 (Kfb,K2)totheendoftherow.[20 sts]
BreakoffYarnDandjoininYarnG.
Row 3 (Kfb,K3) to the end of the row. [25 sts]
Row 4 Purl.
*Row 5 K5,turn.
Begwitha purlrow,workinststfor 3 rows on these 5 sts.
Row 9 SSK,K1,k2tog. [3 sts]*
Castoff3 sts.
WithRSfacing,rejointheyarntotheremsts.
Repeatfrom* to* untilallstshavebeenworked.
GERBERA(MAKE2 IN YARN D, 2 IN YARN E
AND2 INYARNF)
MAINFLOWER
Caston 10 stsusingYarnD,E orF and3.25mmneedles.
*Castoff9 sts.Transfertheremaining stitch back onto the
left-handneedlewithout twisting it.
Caston9 sts.
Repfrom* 14times. (15 petals made.)
CENTRE
Caston 16 stsusing3.25mmneedlesandYarn B.
Row 1 (K2tog) to the end of the row. [8 sts]
B&T.
PETUNIA(MAKE 2 IN YARN F AND 2 IN
YARNG)
MAINFLOWER
Caston7 stsusing 3.25mm needles and Yarn F or G.
*Knit2 rows.
Row 3 K6,turn.
Row 4 andeveryalt row Knit.
Row 5 K5,turn.
Row 7 K4,turn.
Row 9 K3,turn.
Row 11 K2,turn.
Row 12 Knittoend.
Knit2 rows.
Repeatfrom * 4 times.
Castoff.
FLOWERCENTRE
Caston8 sts using Yarn C.
B&T.
FINISHING
MAINBODY
Sewa runningthreadthroughthecast-onedgeandpullit up tightly.
Withright-sidestogether,jointhetwosidestogetherfor
approximately8cmfromthecentreofthecast-onedge.Jointhe
twosidestogetherfor3cmoneithersideoftheturningrow.
Turnworktotherightside,foldingthebasketportionuptotheright
sidealongtheturnrow.Oversewthebasketsidestothesideedge
ofthecosy.Placethehandleacrossthetopoftheteapot,catching
downthetwosideseamslevelwiththecolourchangerow.
Lightlytack the top of the Handle to the main piece.
ROSE
RolltheRoseup(sideseamtosideseam)alongthecast-offedge,
allowingthecast-onedgetocurlinonitself,withthecurlfacing
outwards.Sewthecast-offedgetoitselfacrossthebottomofthe
layers to form a small cylindrical shape that is flat on the bottom
andhasa curling top.
LEAF
Sewa runningstitchthroughthestraight-side edge, and then pull
thestitchesuptotighten them.
GERANIUM
Sewthesideseamfromthecentreto the colour change row.
Neatenalltheends for the petals.
GERBERA
Sewa runningstitchthroughthelong-sideedgeandpullthe
stitchesuptodrawthepetalsintoa circle.Flattenthepetals
slightly,sothattheflowerliesflat.Sewthesideseams of the
centre,thensew it to the centre of the flower.
PETUNIA
Sewthecast-onandcast-offstitchestogether.Sewa runningstitch
alongtheshort-sideedgeandpullthestitchesup to close the gap.
Sew the centre to the middle of the Petunia.
Oncealltheflowershavebeenmadeup,placethemonthetop
portionoftheTeaCosy(abovethebasketweavesection)ina
randompattern.Onceyouarehappywiththeplacement of the
flowers, sew them to the top of the Tea Cosy.
Oncealltheflowershavebeen
knitted,pinthemtoyourbasket,
movingthemarounduntilyou’re
happy, then sew them in place