Analysis and Design of a Modern SCADA System

(fajer) #1
Figure 3. 7 : FTP downloads response time(X-axis is the simulation duration in minutes)

Figure 3. 8 illustrates Remote login response time in second, where Remote
login is happen between server and a substation at a time.


Figure 3. 8 : Remote login response time(X-axis is the simulation duration in minutes)^

Figure 3. 9 illustrates Video conferencing packet End-to-End Delay in
second.This result includes video streeming and conference, where the
video service need time to reach stability status.
Free download pdf