Algebra Demystified 2nd Ed

(Marvins-Underground-K-12) #1

404 algebra De mystif ieD



  1. Let t represent the number of hours Printing Press II needs to print the
    run by itself. Because Printing Press I needs 5 fewer hours than Printing
    Press II, t − 5 represents the number of hours Printing Press I needs to
    complete the run by itself.


Worker Quantity Rate Time
Press I 1 1
t− 5

t − 5

Press II 1 1
t

t

Together 1 1
6

6

The equation to solve is^1
5

11
tt 6

.
– 

+  =  The LCD is 6t(t − 5).

1
5

11
6

651
5

651 651
6
6

tt

tt
t

tt
t

tt

t


+=

−⋅

+−⋅= −⋅

+

() () ()

665 5

66305
12 30 5

017

2

2
2

()()ttt

tt tt
ttt

t

−=−

+−=−
−=−

=−tt
tt

+
=− −

30
01 () 52 ()
t − 15 = 0 t − 2 = 0 (This cannot be a solution because
t = 15 t = 2 2 − 5 is negative.)

Printing Press II can print the run alone in 15 hours and Printing Press I
needs 15 − 5 = 10 hours.


  1. Let t represent the number of hours Pipe II needs to fill the reser-
    voir alone. Pipe I needs 1 hour 40 minutes less to do the job, so
    tt –  114060 =  –  32 = t –  35 represents the time Pipe I needs to fill the reservoir
    by itself.

Free download pdf