Intermediate Algebra (11th edition)

(Marvins-Underground-K-12) #1
Solving a Work Problem

It takes two carpet layers 4 hr to carpet a room. If each worked alone, one of them


could do the job in 1 hr less time than the other. How long would it take each carpet


layer to complete the job alone?


Step 1 Readthe problem again. There will be two answers.


Step 2 Assign a variable.Let the number of hours for the slower carpet layer


to complete the job alone. Then the faster carpet layer could do the entire job in


hours. The slower person’s rate is and the faster person’s rate is


Together, they do the job in 4 hr.


1

x- 1.


1

1 x- (^12) x,


x=


EXAMPLE 3


514 CHAPTER 9 Quadratic Equations, Inequalities, and Functions


Recall from Section 7.5that a person’s work rate is part of the job per hour,


where tis the time in hours required to do the complete job. Thus, the part of the


job the person will do in xhours is^1 t x.


1
t

PROBLEM-SOLVING HINT


Multiply by the LCD,
x 1 x- 12.

Time Working Fractional Part
Rate Together of the Job Done

4

4 1
x- 1

(^1 142)
x- 1
1
x^142
1
x Sum is 1
whole job.
Slower
Worker
Faster
Worker


Step 3 Write an equation.


Part done by slower worker Part done by faster worker 1 whole job

1


Step 4 Solvethe equation from Step 3.


Distributive property
Distributive property
Standard form

This equation cannot be solved by factoring, so use the quadratic formula.


Quadratic formula

Simplify.

x= Use a calculator.


9 + 265


2


L8.5 or x=


9 - 265


2


L0.5


x=


9  265


2


x = a=1, b=-9, c= 4


- 1 - 92  21 - 922 - 4112142


2112


x=


- b 2 b^2 - 4 ac


2 a


x^2 - 9 x+ 4 = 0


4 x- 4 + 4 x= x^2 - x


41 x- 12 + 4 x= x 1 x- 12


x 1 x- 12 a


4


x


+


4


x- 1


b = x 1 x- 12112


=


4


x- 1


+


4


x


+ =

Complete
a table.
Free download pdf