Solving a Work Problem
It takes two carpet layers 4 hr to carpet a room. If each worked alone, one of them
could do the job in 1 hr less time than the other. How long would it take each carpet
layer to complete the job alone?
Step 1 Readthe problem again. There will be two answers.
Step 2 Assign a variable.Let the number of hours for the slower carpet layer
to complete the job alone. Then the faster carpet layer could do the entire job in
hours. The slower person’s rate is and the faster person’s rate is
Together, they do the job in 4 hr.
1
x- 1.
1
1 x- (^12) x,
x=
EXAMPLE 3
514 CHAPTER 9 Quadratic Equations, Inequalities, and Functions
Recall from Section 7.5that a person’s work rate is part of the job per hour,
where tis the time in hours required to do the complete job. Thus, the part of the
job the person will do in xhours is^1 t x.
1
t
PROBLEM-SOLVING HINT
Multiply by the LCD,
x 1 x- 12.
Time Working Fractional Part
Rate Together of the Job Done
4
4 1
x- 1
(^1 142)
x- 1
1
x^142
1
x Sum is 1
whole job.
Slower
Worker
Faster
Worker
Step 3 Write an equation.
Part done by slower worker Part done by faster worker 1 whole job
1
Step 4 Solvethe equation from Step 3.
Distributive property
Distributive property
Standard form
This equation cannot be solved by factoring, so use the quadratic formula.
Quadratic formula
Simplify.
x= Use a calculator.
9 + 265
2
L8.5 or x=
9 - 265
2
L0.5
x=
9 265
2
x = a=1, b=-9, c= 4
- 1 - 92 21 - 922 - 4112142
2112
x=
- b 2 b^2 - 4 ac
2 a
x^2 - 9 x+ 4 = 0
4 x- 4 + 4 x= x^2 - x
41 x- 12 + 4 x= x 1 x- 12
x 1 x- 12 a
4
x
+
4
x- 1
b = x 1 x- 12112
=
4
x- 1
+
4
x
+ =
Complete
a table.