Dalmia DSP Success Story

(Project Pridr) #1

TECHNICAL PREPARATION 17



  1. Capacity requirement with respect to operating
    grindability: Capacity requirement given initially
    was of 570 TPH @ 15% residue on 90 microns,
    considering kiln guaranteed capacity of 7,200 TPD,
    but during order finalization the kiln guaranteed
    capacity increased to 8,000 TPD, hence raw mill
    guaranteed output requirement was increased from
    570 to 600 TPH. The raw meal residue maintained
    in both the operating lines are around 17–18%
    on 90 microns and the operating grindability was
    around 4.5 kWh/t. The mill output requirement for
    kiln potential capacity of 9,500 TPD clinker comes
    to 656 TPH at 22 running hours per day of mill.
    The capacity of mill was selected in such a way
    that at operational residue and grindability of line 1
    and 2, the line 3 mill shall produce more than 656
    TPH. We have also asked suppliers to give us the
    guarantee (indicative) on 90:212 microns residue at
    ratio of 10:1 for better control of grain size to ensure
    improved burn ability of kiln feed.

  2. Feed moisture: The maximum feed moisture given
    for design was 4%, however the actual average
    moisture at existing limestone was around 1–1.5%,
    hence guarantee would be on 1% feed moisture.

  3. Available gas temperature: We have WHRS
    concept since beginning so we intended suppliers
    to design the mill in such a way that it can run with
    150 ̊C (PH boiler outlet temperature). It was also
    discussed that since the material grindability is very