Dalmia DSP Success Story

(Project Pridr) #1

28 PROjECT PRIDE


Unique features of this project:


First time in the world:



  1. Latest JETFLEX burner (biggest in size) for kiln firing

  2. Kiln slope of 4.5%

  3. Total retention time in calciner is 14 seconds

  4. Biggest size and high thermal efficiency of latest
    technology low pressure cyclone

  5. Lowest pressure drop of 350 mm of water gauge at
    PH fan inlet

  6. Solar power system installed above raw material
    shed first time in cement industry. As per the PG
    parameter of installed solar system approximately
    24 lakhs unit (kWh/annum) generation expected

  7. Dust suppression system considered for all transfer
    towers, limestone crushing plant, and stacker and
    reclaimer area

  8. By aluminizing of internal and external surface of
    complete pre-heater and kiln along with extra hysil
    insulation saved 30% radiation losses

  9. CCX cyclone for 6th stage pre-heater which will
    give heat saving 6 kcal/kg clinker

  10. Civil construction time of pre-heater is lowest (8.5
    months from plant order)


Other key features:



  1. Automatic hot meal sampling

  2. Gamma ray detector provided in all pre-heater
    cyclones to avoid jamming of cyclones