Dalmia DSP Success Story

(Project Pridr) #1

32 PROjECT PRIDE


Based on the above concepts we are going to have various
advantages in terms of fuel saving, power saving, equipment
reliability, and energy-efficient latest technology equipment:


•   The standard cement plant has 55 kWh/ton of clinker
specific power consumption and 690 kcal/kg of clinker
specific fuel consumption. As per the equipment
selection considered by DCBL, it is expected to get
specific power consumption of <40 kWh/ton and
specific fuel consumption of 650–660 kcal/kg
• Therefore, the net saving of power is 15 kWh/ton and
in fuel 30–40 kcal/kg clinker
• Plant & machinery and construction cost is 2,700 Rs/
MT equivalent to 35 USD/MT

With the latest technology used for this project, we will be
benefited in various ways in quality, reliability, environment
and safety, productivity and operating cost as mentioned
below:


S. No. Action taken
(Equipment)

Benefits Locations

A Product focus and quality management initiatives
1 Cross-belt
analysers


  • Adjustment
    in material
    proportionate at raw
    mill, better mining
    plan, and taking
    corrective action for
    better quality

  • Monitoring coal and
    additive parameter

    • Limestone
      stacker and raw
      mill conveyor

    • Coal and
      additive belt