267.Answer:D.
PMBOK® Guide, page 488 , Section 11.5.3.3; andGlossary
Residual risk. The risk that remains after risk responses have beenimplemented.
268.Answer:A.
PMBOK® Guide, page 211 , Section 6.5.2.3; andGlossary
Resourceleveling.Aresourceoptimizationtechniqueinwhichadjustmentsaremadetotheproject
scheduletooptimizetheallocationofresourcesandwhichmayaffectcriticalpath.Seealsoresource
optimizationtechniqueandresourcesmoothing.
269.Answer:B.
PMBOK® Guide, page 185 , Section 6.2.2.3; andGlossary
Rollingwaveplanning.Aniterativeplanningtechniqueinwhichtheworktobeaccomplishedinthe
neartermisplannedindetail,whichtheworkinthefutureisplannedatahigherlevel.
270.Answer:C.
PMBOK® Guide, page 254 , Section 7.3.3.1; andGlossary
Costbaseline.Theapprovedversionofthetime-phasedprojectbudget,excludinganymanagement
reserves,whichcanbechangedonlythroughformalchangecontrolproceduresandisusedasa basis
forcomparisontoactualresults.
271.Answer:D.
PMBOK® Guide, page 161 , Section 5.4.3.1; andGlossary
Scopebaseline.Theapprovedversionofascopestatement,workbreakdownstructure(WBS),and
it’sassociatedWBSdictionary,thatcanbechangedusingformalchangecontrolproceduresandis
usedasabasisformcomparisontoactualresults.
272.Answer:A.
PMBOK® Guide, page 478 , Section 12.1.3.5; andGlossary
Sourceselectioncriteria.Asetofattributesdesiredbythebuyerthatasellerisrequiredtomeetor
exceedtobeselectedforacontract.
273.Answer:B.
PMBOK® Guide, page 477 , Section 12.1.3.4; andGlossary
Statementofwork(SOW).
A narrative description of products, services, or results to be delivered by the project.