PMBOK® Guide, page 28 , Section 1.2.5; andGlossary


Tailoring.


Determining the appropriate combination of processes, inputs, tools, techniques, outputs, and life
cycle phases to manage aproject.


275.Answer:D.


PMBOK® Guide, page 296 , Section 8.2.3.2; and Glossary


Test and evaluationdocuments.


Project documents that describe the activities used to determine if the product meets the quality
objectives stated in the quality managementplan.


276.Answer:A.


PMBOK® Guide, page 570 , Section 3 ; andGlossary


Work breakdown structure (WBS).


A hierarchical decomposition of the total scope of work to be carried out by the project team to
accomplish the project objectives and create the requireddeliverables.


277.Answer:B.


PMBOK® Guide, page 161 , Section 5.4.3.1; andGlossary


Workpackage.


The work defined at the lowest level of the work breakdown structure for which cost and duration
are estimated and managed.