Palestine International Airport (Al-Auja)

(Noor Al-Dian Rabaya) #1

Note:


The location of the first exit was estimated based on the requirements of A319 -which
represents the small aircraft of the design group- to ensure their exit from the runway as soon
as possible, and reduce the runway occupancy time.

Step 4- The outcomes of the preceding steps were analyzed and evaluated using
REDMI software, which was used to assess the efficacy of each location and to select the
most appropriate and most likely to be used of all exits. Figures 7- 12 to 7- 15 show the
process of assessment.

I. Enter Runway information: