Palestine International Airport (Al-Auja)

(Noor Al-Dian Rabaya) #1
Step 4- Figures 7- 17 to 7- 19 illustrate the evaluation of the new proposal, as it was adopted
to reduce the occupancy time on the runway so that it can accommodate the expected
operations at the peak hour.

Figure 7 - 17 Exit Taxiway Assessment B – New Runway Exit Proposal


The results of the new proposal evaluation outputs from the software as shown in Figure 7- 18 and
Figure 7- 19


Figure 7 - 18 Exit Taxiway Assessment B - New Runway Exit Aircraft Assignment

Free download pdf