- Runway configuration for Phase 1 2027 - 2034 , and Phas2 II 2035 - 2042 :
A single runway with an annual service volume of 210,000 and a mix index of (81-120) %
is needed, depending on Table 12-9 which is based on FAA (AC 150/5060- 5 ).
A single runway with an annual service volume of 210,000 and a mix index of (81-120) %
is needed, depending on Table 12-9 which is based on FAA (AC 150/5060- 5 ).