Palestine International Airport (Al-Auja)

(Noor Al-Dian Rabaya) #1

  • Runway configuration for phase 2043-2050:


As shown in Table 5-22, the number of annual operations at this phase is 222,650
operations. A double parallel runway with space of 4,300ft, an annual service volume of
215,000, and a mix index of (81-120) % are needed depending on Table 12-9 in the FAA
(AC 150/5060-5).

Free download pdf