Raking Shoring ~ these are placed at 3„000 to 4„500 c/c and can
be of single, double, triple or multiple raker format. Suitable
materials are timber, structural steel and framed tubular
scaffolding.
Shoring
Raking Shoring ~ these are placed at 3„000 to 4„500 c/c and can
be of single, double, triple or multiple raker format. Suitable
materials are timber, structural steel and framed tubular
scaffolding.
Shoring