Concrete Supply ~ this is usually geared to the demand or the rate
at which the mixed concrete can be placed. Fresh concrete should
always be used or placed within 30 minutes of mixing to prevent
any undue drying out. Under no circumstances should more water
be added after the initial mixing.
Ref. BS EN 206-1: Concrete. Specification, performance, production
and conformity.
Concrete Production---Supply