Building Construction Handbook, Eighth Edition

(Nancy Kaufman) #1

Airtightness ~ must be ensured to satisfy public health legislation.
The Building Regulations, Approved Document H1: Section 1,
provides minimum standards for test procedures. An air or smoke
test on the stack must produce a pressure at least equal to 38 mm
water gauge for not less than 3 minutes.


NB. Smoke tests are rarely applied now as the equipment is quite
bulky and unsuited for use with uPVC pipes. Smoke producing
pellets are ideal for leakage detection, but must not come into
direct contact with plastic materials.


Sanitation Systems---Testing

Free download pdf