1182 URBAN RUNOFF
50 100
100
150 200
200
250 300
300
400
500
600
700
TOTAL SOLIDS
NUMBER OF PASSES PER YEAR
STREET SURFACE
SOLIDS LOAD (lb/curb–mi)
FIGURE 2 Street cleaner productivity in Bellevue, Washington.
50 100
10
150 200
20
30
40
50
60
70
80
90
250 300
CHEMICAL OXYGEN DEMAND
NUMBER OF PASSES PER YEAR
STREET SURFACE
SOLIDS LOAD (lb/curb–mi)
FIGURE 3 Street cleaner productivity in Bellevue, Washington.
T A B L E 1
Pollutants retained in catch basins
Constituent % Retained
SS 60–97
Volatile SS 48–97
COD 10–56
BOD 5 54–88
T A B L E 2
Catch basin costs (ENR 5,000)
Range Average
Total Installed Cost, $ 1,014–2,453 2,019
(EPA-600/2-77-051).