292 ELECTROSTATIC PRECIPITATION
TABLE 1
Power plant
Coal-fired
boilerPower plant
Coal-fired
boilerPower plant
Coal-fired
boilerPaper
mill Lime
reburningSteam boiler
Stoker with
lime stoneCement Plant
KilnCement Plant
Kiln
Esp make Walther FLS miljφ FLS miljφ FLS miljφ FLS miljφ FLS miljφ FLS miljφ
Resistivity level High Medium Medium Low High High High
Energy savings 90% 91% 64% 84% 78% 70% 65%
Emission reduction 25% 33% 7% 0% 65% 57% 47%FABRIC FILTER *COLLECTION EFFICIENCY (%)99.9999.9899.9599.9099.8099.0095.0090.0099.5098.00.5 (^125102050)
OPACITY %
CLEAR
STACK
UPGRADED PRECIPITATOR
SUSTAINED LOAD
FIGURE 14 Ravenswood Unit 3 plume opacity as a function of particulate collection system efficiency.^5
C005_005_r03.indd 292C005_005_r03.indd 292 11/18/2005 10:22:05 AM11/18/2005 10:22:05 AM