Project
Estimate No.
Location
Sheet No.
Architect
Date
Items
By
Checked
Waste
Purch.
Prod.
Wage
Labor
Unit Cost
Cost Code
Description
Q.T.O.
Factor
Quan.
Unit
Crew
Rate
Rate
Hours
Labor
Material
Equipment
Labor
Material
Equipment
Total
(^0) $
(^0) $
(^0) $
(^0) $
(^00).
0
ESTIMATE SUMMARY SHEET
FIGURE G.16.
Estimate Summary Sheet.
256