fill, 116
finish, 116
finishing, 108–110
floor slab, 81
footings, 112
forms, 111–114
girders, 109
heating of, 110–111
job-mixed, 92
light-weight, 227
masonry, 120–125, 133
mixer, 118
patching, 108
pavement, 40
precast, 114–118, 215
pump, 111
ready-mix, 92, 116
slab, 99–112, 227
strength, 92, 116
summary sheet, 101
testing, 92
topping, 116–117, 215
type, 92
walls, 109, 111–112
water resistance, 176
Conditions
weather, 28, 54
working, 54
Conduit
electrical, 214–215
in metal studs, 197
Constructability, 12
Construction
management firm, 11
manager, 2, 4, 8
methods, 2, 5
planning, 6
safety, 81
team, 3
type, 29
Construction Specifications Institute,
18–20, 25, 34
Contingency, 18, 48
Continuous footing, 93–94, 96
Contour lines, 68
Contract, 5, 8, 11–14
cost-plus-fee, 13
documents, 7–8, 11–12, 28–29, 46
execution date, 14
expires, 57
fixed price, 12, 14, 25
lease, 64
lump sum, 12, 14, 25
negotiations, 2, 47
owner/contractor, 7, 18, 22, 24
separate, 11, 66
single, 11–12, 66
stipulated sum, 12, 14, 25
sum, 14
Contractor (general/prime), 5, 9, 11–15,
18, 24–25, 27, 32, 34, 45–48,
214–215, 218
speciality/subcontractor, 1, 4–5, 11, 25,
28, 31–33, 45–47, 50
advantages, 32
carpet, 210
disadvantage, 32
door, 192
drywall, 201, 203
excavating, 40, 87–88
electrical, 214–215
flooring, 209
framing, 169
HVAC, 215, 221
masonry, 134
metal
deck, 143
joist, 139
painting, 211–212
pile, 89
plaster, 205
plumbing, 215
proposals, 28
roofing, 180–182, 185
steel deck, 143
tile, 211
waterproofing, 176
wetwall, 205
window, 188–189
subdrains, 90
subfloor, 155
wood, 208
Control joints, masonry, 129
Conversion factors, 243–244
Conveyors, 111
Cooler door, 192
Coordination, 215–216, 220–222
Coping, masonry, 132
Cork underlayment, 208
Corner, wood walls, 157
Cornices wood, 169
Corrugated metal sheets, 183
Cost
accounting, 10, 18, 64
control procedures, 51
evaluation, 4
freight, 63
mobilization, 61
operating, 61–62
ownership, 63–64
plant, 28
standard, 39
Cost-plus contract, 45
Cost-plus-fee agreement, 13
Counter tops, 227
Cove base, 209
CPA, 43
Craft personnel, 9, 32, 54
Crane, 49, 54, 65, 111, 117, 129, 132,
142–143, 171
Credit, 15
Crew, 39, 59–60
Cross-section method, 69–76
Curbs roof, 180, 182
Curing, 92, 110–111
Curtain wall, 187
productivity rates, 189
Cut and fill workup sheet, 68, 74–75
Cut, excavation, 67–70, 72–74, 76–78, 81, 87
Cut stone, protecting, 50
Cycle time analysis, 55
D
Dampproofing, 175, 177
Data
entry, 38
historical, 9, 53
Database, 6, 10, 28, 39–40
Davis-Bacon wages, 57
Days
calendar, 14
working, 14
Decking
steel, 136, 142–143
wood, 154, 172–173
laminated, 173
Deduct price, 25
Delays, 28
Delivery, 33, 54
dates, 5
Demand charge, power, 50
Dental insurance, 58
Deposit, 8, 22
Depreciation, 62
Design-bid-build, 1, 7–8
Design-build, 2, 4, 8
Designer, 6
Detailed estimate, 2, 30, 226
Details, structural, 93
Developers, 5, 13
Dewatering, 88
Diamond lath, 206
Direct
cost, 43
field costs, 1, 5
Discrepancies, 36
Dishwasher, 218
Dodge Reports, 8
Donation, 43
Door, 186–195
acoustical, 192
buck, 193
bulletproof, 192
checklist, 194
cooler, 192
fire rating, 190–192, 194
folding, 192
frames, 193
freezer, 192
hand, 191
heads, 194
jambs, 194
machining, 192
metal, 227
moldings, 190
overhead, 192
INDEX 263