Estimating in Building Construction

(Barré) #1
Overhead and Contingencies 49

FIGURE 6.5.Sample Schedule.

 Ladders and stairs—used prior to permanent ones being


installed
 Temporary partitions—used to separate new construc-


tion from existing facilities
 Temporary closures for doors and windows


 First aid


 Construction elevators, hoists, and cranes


 Noise control


 Dust control


 Water control


 Te l e p h o n e
 Heat
 Lights and power
 Computers
 Stationery
 Project sign and associated signage

To Estimate Cost
Labor Typically none, except for office set-up

Materials/Equipment

Barricades and Signal Lights

 Building and maintaining barricades
 Cost of maintaining signal lights

To Estimate Cost
Labor

Material
Quantity of materialsUnit price

Quantity of materialsProductivity rate

 Pest/rodent control Duration required at job siteMonthly cost


To Estimate Cost
Labor


Material

Temporary Office

 Temporary job office


 Temporary office for architect/inspector


Quantity requiredUnit cost

Quantity requiredProductivity rate
Free download pdf