Estimating in Building Construction

(Barré) #1
Excavation 73

The area of the cut equals the area of the grid less the area of the fill.


Fill
0. 3 ¿0.4¿ 0 ¿ 0 ¿
4
1,100 sf 193 ccf of fill

Total fill area750 sf350 sf1,100 sf

Fill areaTriangle 0. 5  14 ¿ 50 ¿350 sf

Fill areaRectangle 15 ¿ 50 ¿750 sf

These cuts and fills are entered into the cut and fill columns
on the cut and fill worksheet (Figure 9.16).

Cut
0. 3 ¿0.7¿ 0 ¿ 0 ¿
4

1,400 sf 350 bcf of cut

Cut area2,500 sf1,100 sf1,400 sf

EXAMPLE 9-7 CUT AND FILL


FIGURE 9.12.Grid 10 Layout. 

FIGURE 9.13.Grid 3.

Occasionally when the grid is divided, a portion of the grid will be
neither cut nor fill. Grid 3 is an example of such an occurrence.
Figure 9.13 is an excerpt from the site plan. In that grid, the change
from fill to cut occurs on line 2 between C and D.


From this calculation, the distance from point C2 to the point of no
change in elevation can be found.

Cut

0. 7 ¿ 0 ¿ 0 ¿
3
 875 sf 204 bcf of cut

Fill
0. 3 ¿ 0 ¿ 0 ¿
3

 375 sf 38 ccf of fill

Cut area0.5 50 ¿ 35 ¿ 875 sf

Fill area0.5 50 ¿ 15 ¿ 375 sf

Distance from C20.3¿>0.02¿ per foot of run 15 ¿

 1. 0 ¿> 50 ¿ 0. 02 ¿ per foot of run

Change in elevation per foot of run (C–D)

 0. 3 ¿ 0. 7 ¿ 1. 0 ¿ change in elevation

Total change in elevation (C–D)