Clear the check box for any file or check that you want to exclude from the upgrade.
For example, if you have Simulink, you might want to exclude checks that would
require performing an update diagram, as this can be time consuming.
The Project Upgrade tool upgrades the project and displays the results of the upgrade in
the Upgrade Project Report.
Examine Project Upgrade Report
After upgrading a project, examine the Upgrade Project Report to ensure that the
upgrade occurred as planned.
Upgrade Projects