Delhi Mumbai Expressway at a Glance

([email protected]) #1

Bharatmala


Pariyojana:


Greenfield


Corridors


Doubles the freight movement
speed from 40 km/hr to 80
km/hr in economic corridors

Paradigm shift from connectivity
to transportation efficiency

22 greenfield corridors of
8,280+ km built at a cost of
INR 3.5 Lakh Cr

Technology driven
construction like pre-casting to
accelerate pace of construction

DBM loop construction laying in
interchange near Jaipur, Rajasthan

Precast Box Segment Storage Yard
near Ratlam, Madhya Pradesh
Free download pdf