Salient
Features
Alignment optimized to reduce
travel time to 12 hrs from 24 hrs
along with 130 km distance
reduction (1390 km to 1260 km)~15,000 Ha of land acquired
across five states94 Way Side Amenities to
improve commuter experienceAnnual fuel savings higher
than 320 million liters8 lane access-controlled
greenfield expressway with scope
for future expansion to 12 lane
expresswayRoad laying process in advanced stages of
construction near Sohna, Haryana
- Optimized length mentioned is from Delhi to Mumbai
excluding the Spur to JNPT
DBM laying near Alwar, RajasthanInterchange construction in advanced stage
in the district of Mandsaur, Madhya Pradesh