technical NOTES

(Project Pridr) #1

Clinker LSF SD:


Clinker C^3 S SD:


3.4 Cost Analysis:
Total Package Cost (including Cross Belt Analyzer) : 2100.0 Lacs
If we have conventional lab system, all the equipment like XRF, Hydraulic press &
grinding machine for sample preparation, manual samplers, Particle size analyzers
and cross belt analyzers are also required. The only lefts out items are related to
automation like Industrial Robot, Auto Sample collection, Transport / receiving
stations and related control hardware /software.


Cost impact only due to Robotic lab : 400.0 Lacs


The minimum standard deviations in Raw mix / Kiln feed & Clinker, by using Robo
lab, may be translated in terms of thermal energy and electrical energy saving as
below for typical 5000 TPD plant: