technical NOTES

(Project Pridr) #1

  • Note: Operating cost shall be validated with present condition.


Item UOM (In Rs.)Rate Qty. Amount in (Lakhs) Qty. in (Lakhs)Amount Increase in price
Cement silo
Capacity (MT) MT 5000 CS 7500 CS
Size Mtrs x Mtrs (16m D x 47 m H) (16m D x 53 m H)
Civil Cost
Super-structure
RCC M3 9000 1351 121.59 1450 130.5 Composite rate taken
Reinforcement MT 54000 150 81 300 162
Pre-stressing
cables MT^200000000
Shuttering M2 1500 4000 60 6700 100.5
Cement bag 350 12159 42.5565 13050 45.675
Misc. other
items^00
Total (A) 305.15 438.67
Foundations
RCC M3 9000 650 58.5 860 77.4 Composite rate taken
Reinforcement MT 54000 50 27 90 48.6
Shuttering M2 600 1400 8.4 1500 9
Total (B) 93.9 135
Steel Structure
(C) MT^90000175 157.5^180162
TOTAL A+B+C Rs.in Lacs 556.55 735.67 179.12
Mechanical Equipment
Elevator Spec.
Capacity TPH 450 450
Height C/C Mtrs 54.84 87
Cost/mtrs/TPH Rs./mtr/TPH 350 350
Total Cost Rs.in Lacs 86 137 51
Shaft Power KW 75 144
Power
Consumption KWh/T 0.14 0.27^
Power Tariff Rs./KWh 4.5 4.5
Mill Running
hours Hrs^21 21
Mill running
days/annum Days/Annum^330 330
Power Cost/
Annum

Rs in Lacs. /
Annum 23.39 44.91^22
Free download pdf