technical NOTES

(Project Pridr) #1

  • Note: Operating cost shall be validated with present condition.
    2.4 Conclusion


2.4.1 Blending Silo:
With pre mill feed homogenization with cross belt analyzers in circuits, uniform
quality of the raw material can be fed to mill. Better design of raw material hoppers,
chutes and mill feeding systems increases the availability of the mill. With better
preventive and predictive maintenance program, the breakdown of the mill system
can be minimized or zero breakdowns can be achieved.


Item UOM (In Rs.)R a t e Qty. in (Lakhs)Amount Qty. Amount in (Lakhs) Increase in price
Foundations
RCC M3 9000 250 22.5 277 24.93 Composite rate taken
Reinforcement MT 54000 35 18.9 30 16.2
Shuttering M2 600 750 4.5 1000 6
Piling
Cement bag 350 2250 7.875 2493 8.7255
T O T A L (B) 53.78 55.86
Steel Structure
(C) MT^9000055 49.5^61 54.9^
TOTAL A+B+C Rs.in Lacs 368.81 529.30 160.5
Mechanical Equipment
Air requirement m3/min 54 64
Compressor
volume/unit m3/min^2732
No. of
compressor Nos^33
Cost of one
compressor Rs.^1521
Total Cost Rs.in Lacs 45 63 18
Capacity of
unloading Tone/hour^120120
Compressor
motor power KW^320380
Power Tariff Rs./KWh 5 5
Power
consumption KWh/t^23
Running hours Hrs 10 10
Running days/
annum

Days/
Annum^330330
Power Cost/
Annum

Rs in Lacs./
Annum^40488