technical NOTES

(Project Pridr) #1
S.N. Description UOM Floor mounted Hanging type
-Below GL level m3 1526 2320
-Above GL level m3 2816 5657
13 Rate Rs./m3 23000 23000
14 Civil Cost Rs.in Lacs 998.66 1839.31
15 Total Installation cost Rs.in Lacs 1121.86 1999.31
Operating cost
16 Installed Power KW 56 76.8
17 Power consumption KW 44.8 61.44
18 Power Tariff Rs/Unit 4 4
19 Power consumption per annum 10.04 13.8


  • Note: Operating cost shall be validated with present condition.


1.4 Conclusion
From the above table it is seen that for the floor mounted loaders, the installation
cost will be much lower as compared to hanging type. But for the operation point
of view, truck placement by reversing is a bottleneck however in green field plant,
the layout can be suitably planned to ease of operation. The maintenance as well
as power consumption is higher in case of hanging loader. Though both types of
loaders are in operation in cement plants, it is recommended to go in for floor
mounted type due to various cost advantages.

Free download pdf