technical NOTES

(Project Pridr) #1
S.N. Description UOM Tubular Section

Pre-Engineered
and
Pre-Fabricated
1 Material stored Additive
2 Covered area m2 15000
3 Weight of shed MT 823 1700
4 Civil Quantity m3 1500 2070
5 RCC rate Rs/m3 23000 23000
6 Civil Cost Rs.in Lacs 345 476
7 Shed Cost Rs.in Lacs 900 1530
8 Erection cost Rs.in Lacs 250 450
9 Total Shed cost Rs.in Lacs 1495 2456


  • Note: Operating cost shall be validated with present condition.


4.3 Conclusion
It is seen from the above table that the overall cost of the pre-fabricated shed
is higher than the readymade tubular section structure. The site fabricated
shed is costly as compared to prefabricated, also quality is better in shop
fabricated.


It is better to go for readymade tubular structure to cover the raw material stock
piles due to various advantages mentioned above. It is easy to erect with low
capacity cranes.