technical NOTES

(Project Pridr) #1
Cost Comparison of VRM MPS-5600 with 2 circuits of Roll Press

S. N. Item Description^ UOM

VRM Circuit 1 x 605 TPH
(MPS-5600)

Roll Press Circuit 2 x 315
TPH
Capacity
(MT)

Weight
(MT)

Rs.
In
Lacs

Capacity
(MT)

Weight
(MT)

Rs. In
Lacs

9 Reinforcement
Cost

MT 187 75 91 36


10 Civil Structure
steel

MT 130 86 130 86


11 Equipment MT 59.02 9 Included
in RP
12 Additional equip
(Rev. Belt)

MT At
Hopper
top

98 15


B Raw Mill Building
1 Plate work MT 906.1 598 930 614
2 RCC Cum 5686 682 5300 636
3 Cement cost Cum 2558.7 87 2385 81
4 Reinforcement
cost

MT 855 342 810 324


5 Civil Structure MT 714 471 484 319
6 Equipment MT 1399 215 1275 196
7 Equipment Cost 5403 7506
8 Electric Motor &
items cost

261 360


9 Extra Items for
Instrumentation

324


Total Cost of ownership (Rs. In Lacs) (A+B) 8575 10846
1 Total Cost of
MPS-5600


4242


2 Total Cost of
MVR-6000

3034


3 Saving in case of
MVR 6000

1208

Free download pdf