7.6 Comparative Features of Vertical Roller Mill and Roller Press for Clinker Grinding


S. N. SALIENT FEATURES ROLLER PRESS VRM
1 Welding of grinding
rollers for clinker grind-
ing

Stud type rollers are
provided hence welding
is not required. Hence
consistent production is
achieved throughout life
of the rollers i.e. guaranteed
1 5000 hrs. but practically
can be achieved more than
30000 hours.

Welding of rollers is essential
after every 1000/2000
hrs to maintain consistent
production which need 3-day
stoppage. But recently
Sinter cast rollers which has
less wear and 1 year life are
being incorporated
2 Requirement of grind-
ing aid in the process in
clinker grinding

No grinding aid is required
for normal operation of the
roller press. Using grinding
aid shall result to increase
of production.

Grinding aid is essential
to maintain the bed stability
on higher Blaine. Cost of
the grinding aid is approx.
Rs. 4-5/ton of cement.
3 Requirement of hot air
for clinker grinding

Roller press with ball mill
cement grinding process
does not require hot air and
during the kiln shut down it
can be operated with cold
clinker,

Vertical roller mill needs
hot air to dry out the
added moisture in the
product which is require
d for maintain stable bed
to reduce the vibration
level. The mill is difficult to
operate during kiln
shutdown since it needs
hot gas generator.
Resulting increase of
operating cost.
4 Quality of finish
cement product

Quality of cement product
is better since it gives better
strength after 180 days.

Quality of cement
product is slightly lower.

5 One day strength of
cement

one day strength of
cement is approx. 14-16 MPa

One-day strength of
cement produced VRM
is comparatively less i.e.
approx. 10-11 MPa
6 Production of higher
Blaine of cement

System is very suitable for
higher Blaine (above 4000
Blaine) cement

System is suitable up to
4000 Blaine cement.

7 Flexibility of system in
clinker grinding

Two roller presses
system is more flexible
to run the plant as per
market requirement.
Maintenance can be done
without suffering the
market requirement.

On account of shut down,
market is going to suffer
or we have to invest in
cement Silo to keep the
buffer stock of cement.