technical NOTES

(Project Pridr) #1

S. N. SALIENT FEATURES ROLLER PRESS VRM


8 Power demand Power demand in roller
press system is less hence
will result to less contract
demand.

Power demand in vertical
roller mill system is more
hence it will lead to more
contract demand
9 Loss of production due
to worn out parts

there is no loss of
production throughout the
life of rollers

Loss of production is
approx.
10 ton or 5% of rated
output as the wear and
tear of the rollers increases
hence the average
production will be lower.
But Recently Sinter cast
rollers which has less wear
and 1 year life are being
incorporated
10 Yearly maintenance
cost for clinker
grinding

Maintenance cost is
almost negligible since
no welding of rollers is
required.

Maintenance cost is
higher due to re-welding
of rollers after every
1000/2000 hours.
11 Erection time
requirement

4 months 7 months

S. N. Particular VRM Grinding


Semi-Finish
Grinding (RP +
Ball Mill)

Finish Grinding
(RP)

(^1) Design Compact Complex Compact
(^2) Circuit Simplicity More Less More
(^3) Grinding Process Compression &
Shear
Compression, Im-
pact & Attrition
Compression &
Shear
4
Moisture
Suitable for
Slightly high
moisture
Suitable up to 4%
feed moisture
Suitable up to 4%
feed moisture
(^5) Hot Air requirement High Low Medium
(^6) Power Consumption High High Low
(^7) Product Quality Better Best Better
8
Initial Equipment Cost Moderate High
Low (in case of
less capacity)
Very High (in
case of higher
capacity)