technical NOTES

(Project Pridr) #1

  • Roller Press option is better even with 1 VRM Vs 2 Roller Press circuit due to
    sav ing in specific power consumption and additional power generation in
    WHRS due to less heat requirement in roller press circuit.





    1. 2 Cement Grinding





  • In CVRM, the hot gas requirement is for startup only and no hot gas requirement
    in case of Roller press with ball mill circuit for OPC and PPC (with dry fly ash)
    grinding.

  • Roller press is recommended for OPC, PPC (with Dry Fly ash), However VRM
    shall be preferred for PPC (with wet Fly ash), PSC, PCC and Slag grinding
    due to high moisture handling capacity in VRM.in case of separate grinding of
    slag, Roller press can be preferred as it consumed lesser power than the VRM.
    After slag grinding it can be blended with OPC with the help of blender to
    produce PSC.

  • If variety of products are more, then VRM is recommended as switch over time
    is less and mill system can be stabilized quickly.

  • VRM operation is easy, reliable and simple in layout as compare to Roller Press
    and ball mill circuit.

  • Roller press required skilled operator but VRM operation is operator friendly.