S. N. Parameters Unit
Plant 1 Plant 2
Single
String
Double
String
26 Weight of Refractories (TAD, Calciner with
Exit Duct, PH Cyclones, Riser Duct, Feed
Chutes)
Tone 2550 2750
27 Cost of Refractory Rs/Tone 15000 15000
28 Total Cost of Refractories used in Pyro System Rs (in Lacs) 383 413
29 Loss in refectory cost in double stream Tones/An-
num -30
30 COST OF STEEL
31 Weight of Fabricated Steel (Cyclone and
Riser Duct and Calciner)
Tone 860 670
32 Price of Structure Steel Rs/Mt 80000 80000
33 Total Cost Steel Structures Rs (in Lacs) 688 468.8
34 Saving on Steel Cost in Double Stream Rs (in Lacs) 219.2
35 CIVIL STRUCTURES
36 Total concrete quantity for Pyro M3 6983 6100
37 Cost of Concrete Rs/m2 20000 20000
38 Cost of Civil Structure Rs (in Lacs) 1396.6 1220
39 Saving on Civil Structures Rs (in Lacs) 176.6
40 Kiln feed bucket elevator
41 Cost of Bucket Elevator due to more
height of pre-heater system.
Rs (in Lacs) 226 181
42 Saving in cost due to lesser height of
elevator in double string
Rs (in Lacs) 45
43 TOTAL CAPITAL COST Rs (in Lacs) 2693.6 2282.8
44 Total saving in capital cost due double
string preheater
Rs (in Lacs) 411
45 Total saving in variable cost/annum due
to double string
Rs (in Lacs) 208
46 Additional parameters
47 Civil construction time More 2 months
less
48 Erection Time Requirement More Less
49 Possibilities of capacity enhancement Difficult
because
of space
limitations
Easy
because
of space
availability
50 Cost of maintenance Lower Higher
51 Possibility of Plant stoppages due to
cyclone shutdown
Ye s N o